Wills Memorial Hospital

  • Facility regeneration: approximately 22 percent of building will continue to operate as designed, 40 percent is being renovated for the exclusive use of support services and the remaining 38 percent is a total replacement. Design being phased to enable continuity of hospital operations, with provisions being made to enable continued recycling of facility over time.

  • Second federally approved HUD-242 design-build project in the country; GMK was instrumental in the planning, feasibility study and funding consultation that resulted in project financing (including HUD-242 and Build America Bonds).

CLIENT

Wills Memorial Hospital

LOCATION

Washington, GA

MARKETS

Health

Hospital

SERVICES

Architecture

Engineering

Design-Build

1201 Main Street, Suite 2100, Columbia, SC 29201
ph: 803.256.0000 |  info@gmka.com  

© GMK Associates, Inc. All rights reserved.

  • White Facebook Icon
  • White LinkedIn Icon