McLeod Health System

  • GMK planned, designed and built a seven-story, 244,000-square-foot addition to the existing five-story Women’s Pavilion (which was originally completed by GMK in 1992 and designed for this vertical expansion eventuality). The addition of two Seismic Support Cores enabled I.B.C. compliance. The lower five floors remained occupied and operational during construction of the patient tower above. 

  • Included in the new space: 140 new beds with a trauma surgical intensive care unit, step down unit and surgical patient area; replacement of 12 existing operating rooms and addition of four new operating rooms; complete new central processing and staff support services. Women’s Services and the Children’s Hospital remained on the lower five levels.

 

  • addition of 5,750 SF central energy plant building & related site work

  • master architect and engineer of record, 1995-2005

  • 50+ projects since 1990 scope & cost varied; individual projects up to $70,000,000

project highlights

– emergency department reconstruction 
– vertical expansion of pavilion 
– pavilion parking facility 
– day hospital addition
 – operating room renovations
 – energy plant expansion
 – eight family medicine centers throughout the region 
– master plan update 
– adult & pediatric rehabilitation expansions 
– creation of consolidated cancer center
 – replacement of linear accelerator at main hospital 
– main lobby renovations 
– physician lounge

CLIENT

McLeod
Health System

LOCATION

Florence, SC

 

MARKETS

Health

Hospital

SERVICES

Architecture

Engineering

1201 Main Street, Suite 2100, Columbia, SC 29201
ph: 803.256.0000 |  info@gmka.com  

© GMK Associates, Inc. All rights reserved.

  • White Facebook Icon
  • White LinkedIn Icon
  • White Twitter Icon